データベース環境の最適化のために
戦略的な意思決定や、業務の一層の効率化のためには、個別のアプリケーションやシステムを越えた統合的な情報基盤の構築が必要となります。IBMは、日経コンピュータの顧客満足度調査 RDBソフト(オープン系)でNo.1に選ばれたハイブリッド・データベース、DB2®をはじめ、SolidDB®、Optim™など、多彩なソリューションをご提供します。これらのソリューションを適切な場所で活用することで、お客様のデータベース環境全体の最適化(Optimize)を実現することができます。
IBM TIM 認証の000-324 の問題を挙げて。皆さんが認証を受けるために役に立てばいい
1.A customer needs 12 additional FICON channels on a 2084. Six channels are LX, and six are SX.
The required FICON is Express2. How many FICON Express feature codes will be required to meet
this requirement?
A.3, where each FICON Express2 feature code has four FICON channels
B.4, two feature codes for LX FICON and two feature codes for SX FICON
C.6, three per FICON channel type
D.6, where each FICON Express 2 feature code has two FICON channels
Correct:B
2.z/OS.e runs on which of the following machines?
A.MP3000
B.z900 and z990
C.z800 and z890
D.All zSeries architecture machines
Correct:C
3.Which of the following is NOT a Server-to-Server communication method between two physical
machines?
A.InterSystem Channels (ISC)
B.HiperSockets
C.Integrated Cluster Bus (ICB) channels
D.Channel-to-channel (CTC or FCTC) connections
Correct:B
4.Which of the following software products does NOT have an offering to run under Linux?
A.Oracle
B.WebSphere
C.IMS DB
D.DB2 UDB
Correct:C
5.Which of the following I/O Channel Subsystem components would improve the efficiency of
TCP/IP?
A.Dynamic Channel Path Management
B.Channel Subsystem Priority Queuing
C.SAPs and EMIF
D.Queued Direct Input/Output
Correct:D
6.All of the following apply to z/OS WLM EXCEPT:
A.It provides programming interfaces that can allow customers to set goals for their transactions.
B.It provides goal oriented, dynamic resource management and goals are based on business importance.
C.It simplifies definition, control, and reporting of the performance requirements for z/OS workloads.
D.It coordinates z/OS images across a sysplex to process work towards multiple goals and shares goals
with other products.
Correct:D
7.A performance analysis indicates that a customer's current 2064-2C5 needs more processing
power. The MES is being requested based on the analysis to upgrade from a 2C5 to a 2C7 as soon
as possible. The customer cannot afford the maintenance window for installation. Which of the
following is the preferred action?
A.Ask the customer to schedule the installation when the machine can be stopped.
B.Tune the current machine to improve the performance as much as possible and delay the installation
until the machine can be stopped.
C.Persuade the customer to schedule the installation window immediately.
D.Schedule the installation to be performed concurrently.
Correct:D
8.An Internet Service Provider is considering using a z990 for deploying hundreds of Linux
systems under z/VM. The zSeries platform would provide the MOST value for this customer in
terms of:
A.Processing speed.
B.Response time.
C.Systems management.
D.Memory size.
Correct:C

HP認証はHP会社育成訓練事業部が推し出してIT専門人員に対しての高水準の技術認証である。それの主要な対象はシスアドとネット管理人などのIT専門技術者で、彼らのUNIXとOPENVIEWなどの方面の専門の知識を広げて、それによって全世界公認のHPの IT技術専門家の称号を勝ち取って、自己価値を昇格させて、その市場の競争力を強めます。。HP認証は業界でとても強い権威を持ちます、目の前にもう2000人がHP認証を通しました。

試験の名称: Replication Solutions for the HP StorageWorks EVA

HP0-512 の問題集みんなと分かち合います
1.Which two can be failed over during a Continuous Access EVA planned or unplanned event?
(Select two.)
A.copy set
B.DR group
C.managed set
D.a single HSV controller
Correct:B C
2.Which events can you see in the Replication Solutions Manager?
A.only events that are related to DR groups
B.only the Continuous Access specific events
C.only events that are related to managed sets
D.all EVA events for the subsystems that are part of the Continuous Access environment
Correct:D
3.Which replication method provides highest redundancy within Business Copy?
A.snapclone from a parent disk group
B.snapclone from a non parent disk group
C.fully allocated snapshot from a parent disk group
D.demand allocated snap from a non parent disk group
Correct:B
4.One of two intersite links fails on a Continuous Access EVA high availability configuration.
Which two statements are true? (Select two.)
A.I/O operations transfer from one fabric to the other.
B.If failsafe is enabled, then host I/O operations will stop.
C.Replication Solutions Manager will report a broken connection.
D.All DR groups on the affected path will fail over to other controllers.
Correct:A C
5.Which two statements about managed sets are true? (Select two.)
A.DR groups may belong to only one managed set.
B.Managed sets can be created from Command View.
C.Managed sets can be created from Replication Solutions Manager.
D.Managed sets may include DR groups from multiple storage systems.
E.Managed sets may include DR groups only from a single storage system.
Correct:C D
6.Why must dynamic load-balancing be turned off for all hosts in a Continuous Access EVA
configuration?
A.to ensure that write order of all host I/Os is maintained
B.to ensure that you do not exceed hosts I/O queue depth
C.to ensure that hop count does not exceed maximum of two
D.to ensure that hosts do not use different load-balancing policies
Correct:A
7.What happens by default when a copy set is deleted?
A.The source and destination Vdisks are destroyed.
B.The source and destination Vdisks are preserved.
C.Only the source Vdisk is preserved; the destination Vdisk is destroyed.
D.Only the destination Vdisk is preserved; the source Vdisk is destroyed.
Correct:B
8.On a Continuous Access EVA, how can you clear the failsafe-locked condition? (Select two.)
A.restore the ISLs
B.delete the DR group
C.disable failsafe mode
D.resume the DR group
E.change failsafe property in copy set
Correct:A C

各種のLinuxバージョンは配置と習慣にとって大きい異なることがあります。LPI Level 1 101試験はいろんなバージョンの特徴を含めるには受験生に試験の難度を加えます。たとえば、rpmとdpkgを同時に受ける受験生はRedhatとDebian二つのバージョンに熟練使用することを要求されています。しかし、多くの試験要求はLSBをもとにして制定られて、いろんな衝突がある細部の問題がLSB( http://www.linuxbase.org/ ) を参考することができます、LPI認証に参加してあなたがLSBに理解することに役に立ちます、
117-101の問題集みんなと分かち合います
1. You've downloaded an image file of a boot floppy disk to your hard drive. What is the best utility to
create a boot floppy from the disk image? (Specify a single command without options.)
Answer: dd /bin/dd
2. In which directory must definition files be placed to add additional repositories to yum?
Answer: /etc/yum.repos.d /etc/yum.repos.d/yum.repos.d yum.repos.d/
3. The file myfile.txt contains the following data:
joe:x:100:100:Joe:/home/joe:/bin/bash
mike:x:101:101:Mike:/home/mike:/bin/sh
kevin:x:102:102:Kevin:/home/kevin:/bin/sh
matt:x:103:103:Matt:/home/matt:/bin/sh
What output will be displayed on the screen when the following command is executed:
grep o home myfile.txt
A. No output will be displayed on the screen
B. home
home
home
home
C. /home/joe
/home/mike
/home/Kevin
/home/matt
D. joe
mike
Kevin
matt
Answer: B
4. Which TWO runlevels should never be declared as the default runlevel?
A. 0
B. 3
C. 5
D. 6
Answer: AD
5. What does the command mount a do?
A. It mounts the floppy disk for all users.
B. It shows all mounted file systems.
C. It opens /etc/fstab to edit.
D. It mounts all file systems listed in /etc/fstab.
Answer: D
6. After modifying LILO's configuration file, what command should you run for the changes to take effect?
A. kill HUP `pidof lilo`
B. liloinstall
C. lilo
D. reboot
Answer: C

http://www.killtest.jp/LPICLevel1/117-101.asp