データベース環境の最適化のために
戦略的な意思決定や、業務の一層の効率化のためには、個別のアプリケーションやシステムを越えた統合的な情報基盤の構築が必要となります。IBMは、日経コンピュータの顧客満足度調査 RDBソフト(オープン系)でNo.1に選ばれたハイブリッド・データベース、DB2®をはじめ、SolidDB®、Optim™など、多彩なソリューションをご提供します。これらのソリューションを適切な場所で活用することで、お客様のデータベース環境全体の最適化(Optimize)を実現することができます。
IBM TIM 認証の000-324 の問題を挙げて。皆さんが認証を受けるために役に立てばいい
1.A customer needs 12 additional FICON channels on a 2084. Six channels are LX, and six are SX.
The required FICON is Express2. How many FICON Express feature codes will be required to meet
this requirement?
A.3, where each FICON Express2 feature code has four FICON channels
B.4, two feature codes for LX FICON and two feature codes for SX FICON
C.6, three per FICON channel type
D.6, where each FICON Express 2 feature code has two FICON channels
Correct:B
2.z/OS.e runs on which of the following machines?
A.MP3000
B.z900 and z990
C.z800 and z890
D.All zSeries architecture machines
Correct:C
3.Which of the following is NOT a Server-to-Server communication method between two physical
machines?
A.InterSystem Channels (ISC)
B.HiperSockets
C.Integrated Cluster Bus (ICB) channels
D.Channel-to-channel (CTC or FCTC) connections
Correct:B
4.Which of the following software products does NOT have an offering to run under Linux?
A.Oracle
B.WebSphere
C.IMS DB
D.DB2 UDB
Correct:C
5.Which of the following I/O Channel Subsystem components would improve the efficiency of
TCP/IP?
A.Dynamic Channel Path Management
B.Channel Subsystem Priority Queuing
C.SAPs and EMIF
D.Queued Direct Input/Output
Correct:D
6.All of the following apply to z/OS WLM EXCEPT:
A.It provides programming interfaces that can allow customers to set goals for their transactions.
B.It provides goal oriented, dynamic resource management and goals are based on business importance.
C.It simplifies definition, control, and reporting of the performance requirements for z/OS workloads.
D.It coordinates z/OS images across a sysplex to process work towards multiple goals and shares goals
with other products.
Correct:D
7.A performance analysis indicates that a customer's current 2064-2C5 needs more processing
power. The MES is being requested based on the analysis to upgrade from a 2C5 to a 2C7 as soon
as possible. The customer cannot afford the maintenance window for installation. Which of the
following is the preferred action?
A.Ask the customer to schedule the installation when the machine can be stopped.
B.Tune the current machine to improve the performance as much as possible and delay the installation
until the machine can be stopped.
C.Persuade the customer to schedule the installation window immediately.
D.Schedule the installation to be performed concurrently.
Correct:D
8.An Internet Service Provider is considering using a z990 for deploying hundreds of Linux
systems under z/VM. The zSeries platform would provide the MOST value for this customer in
terms of:
A.Processing speed.
B.Response time.
C.Systems management.
D.Memory size.
Correct:C