1.Which of the following represents the BEST process to accomplish resource
planning?
A. Identifying the required resources in the project charter
B. Identifying the available resources and allocate them to all activities in the current
phase of the project.
C. Identifying the required resources and allocate them to all project activities.
D. Identifying the resources that performed past similar projects, and allocate them to all
project activities
E. None of the above
Answer: C
2.When preparing the probability distribution of cost outcomes for a project, what is
the estimate with a 15% probability of being exceeded approximately one standard
deviation ___________?
A. Above the mean.
B. Below the mean.
C. Below the median.
D. Above the median.
Answer: A
3.What would be the cost performance index if BCWP =350, ACWP = 400, and BCWS = 325? Note:
Budgeted Cost of
Work Performed (BCWP), Actual Cost of Work Performed (ACWP) and Budget Cost of Work Schedule
(BCWS)
A. 0.813
B. 1.078
C. 1.143
D. 0.875
Answer: D
4.Which technique would you be using if you analyze which sequence of activities has
the least amount of flexibility when you need to predict project duration?
A. Critical path
B. Dependency diagramming
C. PERT
D. Gantt chart
E. Monte Carlo method
Answer: A
5.Taking the following table into account, where would corrective action be MOST
effective when you make use of Pareto's Rule?
Origin of Problem Percent of Problems
Design 60
Development 15
Prototype 10
Testing 10
Fabrication 5
A. Development
B. Prototype
C. Fabrication
D. Design
E. Testing
Answer: D
6.Which of the following describes Fast Tracking?
A. Circumventing loopholes.
B. Developing workarounds for previous problems.
C. Increased project risk.
D. Getting people to work longer hours in overtime.
E. Meeting schedule objectives by adding resources.
Answer: C