Filling Embankment
For non-dug or non-fill embankment, first clear road debris and then shovel a thin layer beside the road and then do mound embankment. For filling subgrade, firstly shovel earth from one or both sides and then transport earth to the roadbed center. The earth should be evenly tiled and the thickness of each layer should be less than 30cm.
Push dig Cut
Push backhoe digging cutting is to build the roadbed that is to dig a trench subgrade on the projecting ground. For security consideration, bulldoze from the higher place. Both sides of the slope angle and the center at the same time decrease. Pay attention to make the shovel blade angle slightly away from the slope foot. Excavation cutting should have a certain drainage slope to prevent collapsing. The digging depth should be better less than 2cm.
Muddy area bulldozing
When bulldozing muddy area, the machine is easy to fall, so each volume should not be too large. Try to avoid driving on the way stop, shift, steering and braking, if necessary, bulldoze with Ⅱ gear.
In case of crawler skid, you can appropriately enhance the dozer blade to reduce the amount of bulldozing. If under that condition, the shatui bulldozer for sale can still not walk forward, you can press reverse gear. At this time, do not lift the shovel blade so as not to make dozer forward while resulting in track sinking.