NS0-185 Domain 4, ONTAP Switches, has two objectives: cabling a switched cluster and knowing the software a cluster switch needs. In NetApp's own documentation that means two back-end switches cabled to every node with an inter-switch link between them, then the switch's operating system (NX-OS on Cisco, EFOS on Broadcom, Cumulus Linux on NVIDIA) plus NetApp's reference configuration file, the RCF.

 

That is the short answer. The harder part is that Domain 4 leans on objectives from three other domains: physical cabling in Domain 1, network types in Domain 3, and adding nodes in Domain 5. This post reads the switch pages the way an installer would, turns them into a port map and a software order, and ends with a study plan. Every exam fact here was checked on NetApp's own pages on 28 November 2026.

 

NS0-185 cluster switches cover: two back-end cluster switches joined by a two-link ISL, with four ONTAP controller nodes cabled to both switches

What is the NS0-185 NCSIE exam?

NS0-185 is the exam for the NetApp Certified Storage Installation Engineer, ONTAP (NCSIE) certification. NetApp says it tests your ability to set up, configure, install, test and troubleshoot NetApp storage systems.

 

These facts come from the NetApp Certified Storage Installation Engineer page and NetApp's certification policies:

  • Experience: at least six to 12 months with ONTAP, including setup, installation, testing and troubleshooting
  • NCDA first? Recommended, not required
  • Suggested accreditations: NetApp Cloud Native Associate and NetApp Hybrid Cloud Associate
  • Price: US$200, the standard NetApp certification exam fee
  • Validity: active for 24 months once earned
  • Retakes: after a first failure you can retake at once; after more failures you wait 14 days
  • Account: you need a NetApp account, which can take 4 to 24 hours to create

NetApp's public NCSIE page does not list a question count, a time limit or a passing score. Confirm those when you book, not from a forum post.

Where do cluster switches sit in the six NS0-185 domains?

They sit mainly in Domain 4, but six of the 17 objectives touch cabling, networks or switches. That is more than a third of the blueprint, and NetApp publishes no weights, so you cannot treat any of them as minor.

  • Domain 1: physical cabling of ONTAP nodes
  • Domain 3: configure ONTAP system networking, and the network types used with ONTAP clusters
  • Domain 4: cabling of a switched cluster, and the software needed for cluster switch configuration
  • Domain 5: add or remove nodes in an ONTAP cluster

What is a back-end cluster switch?

A back-end cluster switch connects two or more NetApp controllers to each other. NetApp's switch docs separate these from "front-end" switches, which connect hosts to storage.

 

Three rules from the switch introduction are worth learning word for word:

  • Only NetApp-validated back-end switches, ordered from NetApp, are supported.
  • Cluster switches let you build ONTAP clusters with more than two nodes.
  • When you upgrade, NetApp recommends upgrading ONTAP first and the switch software second.

The cluster switches NetApp lists are the Broadcom BES-53248, the Cisco Nexus 9336C-FX2 (with its 9336C-FX2-T variant) and, in the quick start table, the NVIDIA SN2100. The 9336C-FX2 is also used as a storage switch, and from ONTAP 9.9.1 it can be a shared switch that carries cluster and storage traffic together.

When does a cluster need switches at all?

A cluster needs two supported cluster switches once it has more than two nodes. A two-node cluster can run switchless, with the nodes cabled directly to each other.

 

That difference shows up in Domain 5. NetApp's add-nodes page says that to grow a two-node switchless cluster you must first convert it to a switch-attached cluster using a NetApp-supported cluster switch. Nodes are added in even numbers so they form HA pairs, one node at a time, and every existing node must show as healthy in `cluster show` before you start.

 

A useful exam habit: when a scenario mentions "adding a third and fourth node", ask yourself whether the cluster is switchless today. If it is, the switch work comes first.

Which networks does each ONTAP node connect to?

Each node connects to three separate networks: cluster, management and data. NetApp's ONTAP network cabling best practices explain why and set a few hard lines.

  • Cluster traffic should sit on its own network, apart from all other traffic.
  • Separating management from data and cluster traffic is optional but recommended.
  • A cluster can be created without data network connections, but never without a cluster interconnect.
  • Every node should have two or more cluster connections.

The last rule is the reason there are always two cluster switches. Each node sends one cluster port to switch A and one to switch B, so losing a switch, a cable or a port does not cut the node off from its partners.

 

On the logical side, ONTAP's networking overview names five LIF types: data LIFs, cluster-scoped management LIFs, node-scoped management LIFs, intercluster LIFs and cluster LIFs. Cluster LIFs belong to the cluster SVM and are the ones that ride on the switches this post is about. Intercluster LIFs are different: they carry peering and replication traffic to another cluster, not traffic inside this one.

How do you read a cluster switch cabling worksheet?

You read it port by port, and both switches use the same layout. NetApp's 9336C-FX2 cabling worksheet gives a sample assignment and a blank template.

 

In the sample for the 36-port 9336C-FX2:

  • Ports 1 to 3 are 4x10GbE breakouts for nodes 1 to 3.
  • Ports 4 to 6 are 4x25GbE breakouts for nodes 4 to 6.
  • Ports 7 to 24 are 40/100GbE ports for nodes 7 to 24.
  • Ports 25 to 34 are reserved.
  • Ports 35 and 36 are 100GbE inter-switch links (ISLs) to the same ports on the other switch.

That gives 24 node rows on each switch, ten reserved ports and a two-link ISL. The 12-port 9336C-FX2-T sample uses ports 1 to 10 for nodes, marks 11 to 34 as "requires license" and keeps 35 and 36 for the ISL.

 

The worksheet does not tell you which controller ports to plug in. For that, it sends you to the Supported Cluster Connections section of the Hardware Universe, which lists the cluster ports for each platform. Expect the exam to test that you know where that answer lives.

 

NS0-185 cluster switch port map infographic: 9336C-FX2 sample worksheet bands for breakout, 40/100GbE node ports, reserved ports and the ISL, with the software stack for Cisco, Broadcom and NVIDIA switches

What cabling details catch installers out?

Three notes in the 9336C-FX2 cabling considerations are small but very testable, because each one leaves a port down until someone fixes it.

  1. NVIDIA ConnectX NICs. If a controller connects through ConnectX-6, ConnectX-6 Dx or ConnectX-7 ports, you must hard-code the switch port speed (100000 or 40000) and turn off auto-negotiation.
  2. FAS2820 e0a and e0b. These 25GbE ports need a forward error correction change on the switch ports, `fec rs-cons16`, before they link up.
  3. TCAM resources. On the 9336C-FX2, ports can fail to link up when the switch's TCAM resources are used up; NetApp points to a Knowledge Base article for the fix.

Two more facts belong in your notes. NetApp's cluster setup worksheet says that on a switched cluster each cluster switch must use an MTU of 9000. And the switch requirements page asks for a console cable to the switch console port, a management subnet, and host names and IP addresses for every controller and switch. Most controllers are managed through the e0M interface on the port with the wrench icon.

What software does a cluster switch need?

Every supported cluster switch needs two pieces: its operating system and NetApp's RCF. The switch cannot work in an ONTAP cluster until both are installed.

SwitchOperating systemNetApp fileAlso in the workflow
Cisco Nexus 9336C-FX2NX-OSRCFVerify SSH
Broadcom BES-53248EFOSRCFOptional port licenses, enable SSH
NVIDIA SN2100Cumulus LinuxRCF scriptCSHM file, configure CSHM

The SSH step is not cosmetic. NetApp's switch pages tie it to the Ethernet Switch Health Monitor (CSHM) and to log collection, so a switch without SSH is a switch ONTAP cannot watch. On the Cisco switch you check it with `show ssh server` and `show ssh key`.

 

The BES-53248 adds a licensing twist: its base model is licensed for 16 ports at 10GbE or 25GbE and two 100GbE ports, and more ports need a purchased license. After the RCF is applied, the workflow has you verify the licensed ports.

How do you choose the right RCF?

You pick the RCF that matches how the nodes use their ports, then check that its version fits your ONTAP and switch OS versions. NetApp's RCF overview for the 9336C-FX2 lists the configurations:

  • 1-Cluster-HA: all ports 40/100GbE, shared cluster and HA traffic; required for AFF A320, AFF A250 and FAS500f
  • 1-Cluster-HA-Breakout: adds 4x10GbE and 4x25GbE breakouts for the same shared-port systems
  • Cluster: for FAS and AFF nodes with dedicated cluster ports, except the AFF A320, AFF A250 and FAS500f
  • Cluster-HA-Storage: mixes cluster, HA and 100GbE storage connections on one switch
  • Storage: all ports 100GbE for NVMe storage
  • 2-Cluster-HA-Breakout and 4-Cluster-HA-Breakout: one switch pair serving two or four ONTAP clusters

The key idea is shared Cluster+HA ports. Some systems send HA traffic over the same ports as cluster traffic, and the RCF has to know that. The page also warns that RCF commands can depend on the NX-OS version, which is why NetApp keeps a compatibility table for ONTAP, NX-OS and RCF versions on its support site. The RCF's own banner lists the port and VLAN usage.

What checks come before you touch the switch software?

NetApp's NX-OS and RCF preparation page runs a fixed set of ONTAP checks first. Knowing the order and what each command shows is classic NCSIE material:

  1. Send an AutoSupport maintenance message (`system node autosupport invoke -node * -type all -message MAINT=xh`) so support does not open cases during the window.
  2. Move to advanced privilege with `set -privilege advanced`.
  3. Run `network device-discovery show -protocol cdp` to see which cluster ports reach which switch.
  4. Run `network port show -ipspace Cluster` and `network interface show -vserver Cluster` to check port and LIF status.
  5. On ONTAP 9.9.1 and later, run `network interface check cluster-connectivity start`, wait, then `show` to confirm there is no packet loss between cluster LIFs.
  6. Confirm auto-revert is enabled on every cluster LIF.

What if the data center fabric is not NetApp's?

Then you are dealing with a front-end network, which is a different job from the back-end cluster switches. The cluster switches stay NetApp-validated and dedicated, while hosts reach the data LIFs over the customer's own data center switching. If your role covers that customer fabric as well, this JN0-683 data center exam walk-through shows how a Juniper data center fabric is built and tested, which helps when you sit with the network team at handoff.

 

Keep the boundary clear in your answers. Cabling questions about node-to-node traffic are about the cluster switches; questions about hosts, VLANs to clients or customer uplinks are about the data network and the front-end switches.

 

For more NetApp reading on this blog, the NS0-901 AI Expert post on theory versus NetApp tools covers NetApp's expert-level storage design from another angle.

What does a four-week switch-focused study plan look like?

Plan about six hours a week, with the switch thread in the middle and the other domains around it.

  • Week 1, networks and cabling rules. Read the ONTAP network cabling and networking components pages. Draw a four-node cluster with its three networks and five LIF types. Learn the "two or more cluster connections" rule.
  • Week 2, the port map. Fill in the blank 9336C-FX2 worksheet for a made-up mix of nodes. Look up each platform's cluster ports in the Hardware Universe. Learn the three cabling notes (ConnectX speed, FAS2820 FEC, TCAM) and the MTU 9000 rule.
  • Week 3, switch software. Walk the Cisco, Broadcom and NVIDIA software workflows side by side. Learn the RCF types and which systems need 1-Cluster-HA. Practise the pre-check commands on a lab or simulator if you have one.
  • Week 4, the rest of the blueprint. Cover updates, aggregates, peering, security hardening and the customer handoff. Finish by explaining a switchless-to-switched conversion out loud from start to end.

Which mistakes cost candidates marks?

Most lost marks come from mixing up two similar ideas. These are the pairs to separate:

  • Front-end vs back-end switches. Only back-end cluster switches have to be NetApp-validated and ordered from NetApp.
  • Cluster LIFs vs intercluster LIFs. One stays inside the cluster on the cluster switches; the other talks to another cluster.
  • Switch OS vs RCF. NX-OS, EFOS or Cumulus is the operating system; the RCF is NetApp's configuration on top of it.
  • Upgrade order. ONTAP first, switch software second.
  • Switchless growth. A two-node switchless cluster must become switch-attached before nodes are added.

How would a switch scenario look in your own study notes?

Here is a practice scenario written for this post, not taken from any exam. A customer has a two-node AFF A250 cluster cabled switchless and wants two more nodes.

 

Work it in order. The cluster is switchless, so it must first be converted to a switch-attached cluster with two supported cluster switches. The AFF A250 uses shared cluster and HA ports, so on a 9336C-FX2 the RCF must be 1-Cluster-HA or 1-Cluster-HA-Breakout, not the plain Cluster RCF. Install NX-OS and that RCF, verify SSH so CSHM can monitor the switches, set MTU 9000, cable each node to both switches using the Hardware Universe cluster ports, run the connectivity checks, and only then add the new nodes, one at a time and as an HA pair.

Is there a video on the NCSIE exam?

Yes, though not for the current code. The NWExam channel has no NS0-185 video yet, so here is its NCSIE video for NS0-183, an earlier exam for the same certification. Use it for the study approach, and use NetApp's current pages above for the exam facts.

 

 

When you want timed practice on the full NS0-185 blueprint, the NS0-185 NCSIE practice exam covers all six domains, so you can see whether the switch objectives are still your weak spot.

Frequently asked questions

1. Which cluster switches does NetApp support for ONTAP?

NetApp's switch docs list the Broadcom BES-53248 and the Cisco Nexus 9336C-FX2 or 9336C-FX2-T as cluster switches, and the quick start also lists the NVIDIA SN2100. Only NetApp-validated back-end switches ordered from NetApp are supported.

2. What is an RCF on a NetApp cluster switch?

An RCF is NetApp's reference configuration file for the switch. It is installed after the switch operating system, sets the port and VLAN usage, and comes in versions such as Cluster, 1-Cluster-HA and Cluster-HA-Storage.

3. How many cluster connections should each ONTAP node have?

NetApp's cabling guidelines say each node should always have two or more cluster connections. In a switched cluster that means at least one link to each of the two cluster switches.

4. Should I upgrade ONTAP or the cluster switch first?

NetApp recommends upgrading ONTAP first and then the switch software. Check the compatibility table for supported ONTAP, switch OS and RCF versions before you start.

5. Does NetApp publish the NS0-185 passing score?

No. NetApp's public NCSIE page lists the domains and objectives but not a question count, time limit or passing score. The exam fee is US$200 and the certification stays active for 24 months.