How do I choose a general contractor in the Capital Region?

Ask for three references on projects of your type, your size and in the last two years, then actually call them. Most people ask for references and never ring. The single most useful question is whether the final number matched the contract number, and if not, why.

Everything else on this page is secondary to that one call.

What should a comparable quote contain?

    A scope that states exclusions, not just inclusions. The exclusions are where quotes diverge. Contingency, named as a number rather than buried in line items. Allowances for anything not yet selected, with the basis stated. A schedule with permit review shown as its own duration. Long-lead items identified — switchgear and rooftop units are the usual offenders.

Two quotes that differ by $40,000 are frequently quoting different jobs. Align the exclusions first and the real gap is usually much narrower.

Does it matter that the contractor is local?

It matters for the parts of a job that are not in the drawings. Which municipalities are slow this quarter, which inspectors want what, which subcontractors will actually show up in August, and who can be on site the same day when something fails. A contractor working across Albany, Troy, Schenectady and Saratoga County can sequence around whichever department is currently backed up.

That coordination disappears entirely if you hire separate firms in different towns.

How much contingency should I expect to see?

Ten to fifteen percent, scaled to the age of the building. A flat percentage applied to four very different buildings is a sign nobody assessed them individually. In anything pre-1980, fifteen is realistic; in documented newer construction, ten is defensible.

A contractor who argues for a higher contingency on an older building and explains why is giving you better information than one who matches a competitor number.

What are the warning signs?

A quote well below the others with no explanation for the gap. Reluctance to name subcontractors. No written exclusions. Pressure to sign before a walk-through. And any contractor who has not asked to open something in a building older than they are.

Who should hold the permit?

The contractor, in nearly every case. A permit pulled in the owner name shifts code responsibility to the owner, which is occasionally proposed as a way to move faster. It is not worth it.

What to do next

Get two or three contractors to walk the space together with your drawings before anyone prices it. What each one notices during that walk tells you more about how the project will go than the quotes they produce afterwards.

Clifton Development Group works as a general contractor across the Capital Region, covering Albany, Troy, Schenectady, Saratoga Springs, Colonie, Clifton Park, Latham, Guilderland and Delmar.

Further reading: check it out

Clifton Construction - General Contractor Albany NY
1024 Broadway
Albany, NY 12204
(518) 205-3673

Commercial general contracting, office fit-outs and building renovations across Albany, Troy, Schenectady, Saratoga Springs, Colonie, Clifton Park, Latham, Guilderland and Delmar.

cliftondevelopmentgroup.com