binbanh286のブログ

binbanh286のブログ

ブログの説明を入力します。

Amebaでブログを始めよう!
forbidden griffeys 2012 in time duration, is the correction of these practices, is swinging back.

Beijing News: EMU has created a new speed record, how do you view these records?

Zhou Yimin: Our high-speed rail ran over 487 km per hour, it was said "the worlds leading Chinese high-speed rail. " In fact, this is only a momentary speed, no real value, just look at the vehicle acceleration test, take a few parameters. French high-speed rail back ran over 570 km of the experimental speed.

3 How to test before operation

before
jordan high heels the official opening of the Beijing-Shanghai high-speed railway, a variety of its technical staff The testing until the end of the line all the tests will begin operations.

Beijing News: CRH380 from design to volume production fast: last year, trial-like vehicle, completed in May, off the assembly line in September, November The testing in January this year to run.

Zangqi Ji: approved the constaruction of Beijing-Shanghai line, the result was not met 350 km per hour, required to go 380 km Beijing-Shanghai line. We began working towards a new 380. Foreign-developed a new model, often take several years, a lot of harsh test, and ultimately to shape.

Zhou nike high heels Yimin: run 300 km per hour the car, there must be 350 to 360 kilometers per hour under the safe operation of the lab report for a long time, China may still lacking.