(3/14〜)アナーバー市内近郊通行止め情報 | ミシガン州アナーバー生活情報(Living in Ann Arbor, Michigan info)

ミシガン州アナーバー生活情報(Living in Ann Arbor, Michigan info)

ミシガン州アナーバー在住14年主婦、現地コーディネーターが更新するアメリカ生活情報ブログ。アナーバー駐在、ミシガン駐在、または定住の世帯向けに、7割仕事、3割自分の趣味嗜好で更新する情報ブログです。


さて、早くもそんな季節?ということですが、諸々な理由で特に今週末から、アナーバー・Washtenaw近郊で通行止めバツレッド情報が多数ありますので、特に週末車お出かけの世帯は以下ご確認ください下矢印

 

 

 



 

バツレッドAnn Arbor - M-14: The east bound M-14 ramp at the U.S. 23 interchange will close for construction from March 15 to March 16.

 

バツレッドAnn Arbor - Pontiac Trail: The bridge will close in both directions at M-14 and U.S. 23 starting 7 a.m. March 15 through 7 a.m. June 6.

 

バツレッドAnn Arbor - U.S. 23: A single, southbound lane will close from M-14 to Nixon Road on March 15 and March 16 for construction.

 

バツレッドAnn Arbor - U.S. 23: There will be a double lane closure on northbound U.S. 23 from Nixon Road to M-14 on March 15 and March 16 for construction.

 

バツレッドNewport Road: A lane will close in both directions at M-14 for maintenance at 9 a.m. Monday, March 17 until 3 p.m. Tuesday, March 18.

 

バツレッドMiller Avenue: The street will close between Newport Road and Seventh Street at 9 a.m. Monday, March 24. It will be closed until 7 p.m. Monday, July 7 while crews install water main, stormwater drains road curbs and pavement.

 

バツレッドIndependence Boulevard: The street will close between Packard Road and Emerald Avenue at 9 a.m. Monday, March 17 until 5 p.m. Friday, March 21 for underground utility work.

 

バツレッドWashtenaw Avenue: A lane is closed in both directions starting until 3 p.m. Friday, March 28.

 

バツレッドEast Washington Street: The westbound lane is closed between South Division and South State streets until 5 p.m., Friday, May 16. The closure comes as as construction continues on a 19-story high rise on 616 E. Washington St.

 

バツレッドEast Liberty Street: The eastbound lane is closed between Thompson and Maynard streets until 5 p.m. Friday, March 21 while crews install a utility lead.

 

バツレッドChurch Street: The northbound lane between Willard and Hill streets is closed for almost two years for the construction. The lane will reopen April 1, 2027.

 

バツレッドEast Medical Center Drive Bridge: Traffic is shifted to the east side for the third phase of the rehabilitation and widening project through Friday, June. 20.

One vehicle lane in each direction on the bridge will remain open throughout the project duration. Other restrictions include the following.

  • No northbound East Medical Center Drive left turn will be allowed onto westbound Fuller Road.
  • No southbound Maiden Lane left turns will be allowed onto eastbound Fuller Road.

バツレッドPittsfield Township - Platt Road: There are intermittent lane closures between Textile and Morgan roads through May 2025 for permit work.

 

 

以上上矢印が抜粋となりますが、Washtenaw近郊の他の通行止め情報はメ記事内に記載上差しされていますので、必要な方はご参照くださいベル