Nowadays, solar cell is popular and often equipped with house.

And fuel cell is coming popular as Enefarm .


In addition, there is lithium ion cell. These there types of cell are earned a nickname “Three brothers of cell”.


Shizuoka gas company will build residential area named Eco life square Mishima Kiyozumi .

There are some houses equipped three brothers of cell.


The combination of three brothers of cell is controlled with IT technology aiming zero electric consumption served from power station.


This type of house is called smart house The new town or smart community is coming soon.

In Japan, 2 million tons of used wear is binned per year. A half of it is made of cotton.


Japan environment planning has some bio technology which produces alcohol from cotton.


Now some retail companies accept some used wear as Fukufuku project which works with Japan environment planning.


Muji accepts it from 1 through 21 June.


SELF+SERVICE  accepts it from 1 through 30 June.


Marui group accepts it from 1 through 27 June(in case of swimming wear and yukata or summer cotton kimono,through 31 July).


Wasted cotton turns to energy.

There are various electric facilities in Japan. And those must be controlled properly with electric engineering. Therefore the engineering knowledge must be certificated in official. Electric chief engineer is provided with Japanese government to proof its knowledge. This engineer must be had at any place such as generating station, school, supermarket which has any electric facility.


Electric chief engineer is classified into three divisions according to its voltage namely class 1, class, 2 and class 3. Class 3 is the most popular division which can handle less than 50kV including 6.6Kv line mostly equipped. At home, 100V is provided after transforming from 6.6kV.This is controlled by Power company. On the other hand, 6.6kV is provided directly to big building, factory which uses large quantity of electric power. And 440V, 220V or other level of voltage is transformed to use it for motor or facilities by themselves.

They use electric power with various machines and facility and proper usage is required. Therefore 6.6kV is provided directly and its electric facility is controlled with electric chief engineer. In fact, almost of electric facility works with 6.6kV and controlled with the 3rd class electric chief engineer and over 50kV voltage facility, controlled by 2nd class electric chief engineer, is not so much.
Class 3 controls less than 50kV (except generating plant over 5000kW)

Class 2 controls less than 170kV

Class 1 controls no limit
This certificate can be had after passing the examination carried out once a year. It has
some categories namely theory, power, machine and law. Any experience is required and any national person takes this examination which passing line is 60% of 100 point.
Four categories have to be passed in 3 years. So far, only 10% people can pass this exam.

Over 5 years experience after taking this certificate provides another permission to have a personal office as electric facility management office. It can be run with over some million JPYen or ten thousand dollar income gain per year.

Electric power becomes important year by year. And electric engineer is required everywhere in the world. If this web site can help your business, it is this web master’s pleasure.